Welcome
This website has been created to facilitate public input and provide facts about the U.S. Route 34 at EJ&E/CN Railroad Study, process, and schedule. We invite you to explore the website and provide your comments and recommendations regarding the study through our Contact Us section.

News and Events
Project Status Update
The study phase for the project has been completed. Design Approval of the Phase I Combined Design Report was provided on June 1, 2012. Final design of the project has been completed. Utilities have begun relocating their facilities that are in conflict with the project. IDOT has been acquiring temporary and permanent easements needed for the project.

An advance construction contract will construct a new ComEd utility service road with relocated entrance from McCoy Drive. Plans for that work were sent to contractors for bidding with construction of it to begin this spring and be completed during 2014. That work will enable the existing service road entrance from Ogden Avenue just west of the CN Railroad tracks to be closed so the elevated roadway can then be built.

Plans for a steel beam fabrication contract for the highway overpass bridge have been sent to contractors for bidding with that off-site work to begin this year. That work will allow steel for the bridge to be available for delivery as soon as it is needed.

Plans for the main contract that will build the grade separation will be sent to contractors for bidding soon. Initial work under that contract will consist of constructing temporary storm sewers and pavement widening. It will be performed during the summer and fall of 2014 and require a temporary reduction to one traffic lane in each direction. The north portion of the highway bridge over the railroad and the elevated roadway leading up to it will then be built during 2015 with one traffic lane in each direction maintained. The remaining south portion of the project will then be built during the following year with one lane of traffic in each direction continuing to be maintained until completion of the project during the fall of 2016.

Quick Links

Study Area
Study Process
Schedule
Project Team
Public Meetings
Media Center

IDOT Privacy Statement | Illinois Privacy Information | Kids Privacy | Web Accessibility  | FOIA
cheap jordans jordan 3 wolf grey sport blue 6s wolf grey 3s louis vuitton outlet kate spade outlet Lebron 11 sport blue 6s kate spade outlet kate spade outlet sport blue 14s sport blue 6s Louis Vuitton Outlet jordan 3lab5 louis vuitton outlet wolf grey 3s sport blue 6s jordan 3lab5 louis vuitton outlet beats by dre outlet